TitleProduct

Small Swing-arm Robot

  • Price:

    Negotiable

  • minimum:

  • Total supply:

  • Delivery term:

    The date of payment from buyers deliver within days

  • seat:

    Guangdong

  • Validity to:

    Long-term effective

  • Last update:

    2021-07-24 07:36

  • Browse the number:

    189

Send an inquiries

Company Profile

Borunte Robot Co., Ltd

By certification [File Integrity]

Contact:boltjqr(Mr.)  

Email:

Telephone:

Phone:

Area:Guangdong

Address:Guangdong

Website:http://www.borunte.net/ http://boltjqr.kartionsports.com/

Product Details


BRTP06ISS0PC



Product lntroduction



BRTP06ISS0PC swing-arm robot is applicable to all types of horizontal injection machine of 30T-150T for take-out products and sprue. Vertical arm is single type.Its up and down,drawing, spinning out, spinning in are driven by air pressure.High speed, high efficiency.It is an economical manipulator.






Product parameter(specification)
















Model




Recommendedl.M.M(ton)




Crosswise Stroke(mm)




Vertical Stroke(mm)




Max.Loading(kg)




Net Weight(KG)




BRTP06ISS0PC




30T-150T




120




650




2




36








Product feature and application



The product is suitable for the injection industry of small objects out; It is especially suitable for taking out small plastic objects such as gaskets, gears, bearings and sliding parts used in household appliances.






Maintenance inspection items and expired



The inspection items and expiration dates are as follows, please implement them:

















































NO.




Range




Time




1




Check if the suction cups, clip and suction are functioning properly




Every day




2




Two-point combination (air source two-piece) drainage




Every day




3




Fixture fixing screws Every day 4 Air compressor drainage




Every day




4




Air compressor drainage




Every day




5




Injection machine cable, operator connector cable




Every day




6




Check if the mechanism is loose




Every day




7




Pull-out guide rod, slide rail lubrication




Every week




8




Upper and lower rails, slider lubrication




Every month




9




Air pressure pipeline connection, whether speed adjustment is normal




Every month




10




Clean appearance




Every week




11




Check vacuum generator function




Every month




12




Inspection of base fixing screws




Every month




13




Hydraulic buffer checking




Every month




14




Air compressor and wire and cable replacement




Three year



Note: When any abnormality of the machine is found, the machine must be stopped for inspection, and no abnormality can be checked before maintenance. The above table is for reference only




http://www.borunte.net/